Net zero goals will require installation of hundreds of miles of cables and pylons

National Grid says seven times as much infrastructure must be built in the next seven or eight years than was built in the last 32

The Telegraph | Operaciones | Utilidades |

Leer noticia completa en el medio original
Spanish